Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ample domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Cuyahoga Community College (Tri-C) Fab Lab Renovations - Sterling Professional Group

Cuyahoga Community College (Tri-C) Fab Lab Renovations

Sterling Professional Group worked with DLZ Architecture of Akron on this commercial construction project at Cuyahoga Community College (Tri-C) in Cleveland. 

This fab lab, called the Ideastation, is a high-tech learning lab with day, evening and weekend hours, accessible to students and their families
A 2,400-square-foot lab designed to promote innovation, creativity and design, and to facilitate mastery of new and emerging technologies
Like all fab labs, the Ideation Station provides a springboard for entrepreneurship within the community and serves as a portal for project-based, hands-on STEM education. Ideation Station features an Epilog laser cutter, Techno CNC 4 x 8 router, Roland vinyl/circuit cutter, 3D printers, other industrial-grade fabrication equipment and electrical tools, and open source software.

Cuyahoga Community College (Tri-C) Fab Lab Renovations